SiteMap

Kibo Japanese Experimental Module

  • About Kibo
  • Mission
  • Supporting Kibo
  • Experiment
  • Experiment

STS-127 Mission Launch Postponed

Last Updated: June 17, 2009
Image:

*All times are Japan Standard Time (JST)

NASA announced postponement of the launch of space shuttle Endeavour’s STS-127 mission, scheduled at 6:40 p.m. on June 17. The launch was scrubbed due to a hydrogen leak at the Ground Umbilical Carrier Plate (GUCP) during tanking.

The GUCP is the overboard vent used to carry excess hydrogen safely away from the launch pad.

A similar hydrogen leak had scrubbed the first launch attempt for Endeavour on June 13. NASA engineers had since replaced a seven inch quick disconnect on the hydrogen vent line to the GUCP leading into the Endeavour's external tank. However, the leak was detected at the same area during tanking today.

≪ Back to List
 
Copyright 2007 Japan Aerospace Exploration Agency Site Policy   Help